Generator Sizing and Transient Response

October 2026 15 min read

Sizing a Generator Is Two Problems

A generator set has to do two different jobs, and a size that is correct for one can be wrong for the other. The first job is steady: carry the running load for hours or days without overheating or overloading the engine and alternator. The second job is transient: absorb a large step, usually the starting of the biggest motor, without the voltage and frequency falling far enough to drop out contactors, trip drives, or upset the UPS.

Many sets are sized only on the first job and then found to struggle on the second, because starting kVA can be several times the running kVA of the same motor. This guide walks through both checks in order, then runs one complete example. It sits alongside the demand load and motor starting guides, and the Generator Sizing and Step Load Calculator automates the sequence below.

Generator sizing sequenceTwo paths that meet. The steady load path: running load, growth and loading limit, site derating. The motor start path: motor starting kVA, voltage dip model, kVA needed for the dip limit. The larger of the two results sets the standard size.STEADY LOAD1Running loadkW to kVA at pf2Growth and limitloading headroom3Site deratingaltitude, ambientMOTOR START4Starting kVAfull-load kVA x multiple5Voltage dip modelX"d series reactance6kVA for dip limitfrom allowable dip7Larger governsround to standard size
Figure 1. Two checks, one answer. The steady load sets one required rating, the motor start sets another, and the larger of the two decides the set.

Ratings: Standby, Prime, and Continuous

The same engine and alternator carry different kVA ratings depending on how many hours a year they run and how the load behaves. ISO 8528-1 defines continuous power, prime power, and limited-time running power, and manufacturers also publish an emergency standby rating. The definitions are not interchangeable, so the first question for any quoted number is which rating it is.

Confirm the exact definition and any limits in the manufacturer's rating data, because different brands phrase their ratings differently. A data center that uses on-site generation only for outages is a standby application. A site that runs gensets to avoid utility charges or as its primary supply is not, and needs the prime or continuous figure.

Step 1: Start From Demand Load and Power Factor

The input is the diversified running load in kW, built up with demand and diversity factors as described in Demand Load Calculation Basics: Demand Factors, Diversity and Design Load, not the sum of nameplates. Divide by the load power factor to get kVA. Generators are rated in kVA at a stated power factor, usually 0.8, so the alternator, not just the engine, sets what the set can deliver at the load's actual power factor.

Step 2: Add Growth, a Loading Limit, and Site Derating

Three adjustments turn the running kVA into a required rating.

Future growth is a project decision. Document it as an explicit line, not a hidden margin. A maximum steady loading, commonly in the range of 70 to 80% for a single critical set, leaves room for transients, aging, and a load that turns out higher than estimated. It is a design choice, not a code value. Site derating accounts for altitude and ambient temperature: engines lose power in thin or hot air, and the manufacturer's rating table gives the correct figure for the engine and cooling system. Enter it as a percentage reduction or work from the derated kVA.

The required steady rating is then:

Light loading is the opposite problem. A diesel set that runs at a small fraction of its rating for long periods can foul and run poorly, so very large sets for small loads are not safe by default. Check the manufacturer's minimum load guidance and the exercise and load-bank requirements that apply to the application.

Step 3: Work Out the Motor Starting kVA

A motor draws its starting current at a very low power factor, and the generator has to supply it. Start with the full-load apparent power, which is the output kW divided by efficiency and power factor, then multiply by the starting current multiple for the starting method.

The starting method is the biggest single lever on generator size, because it multiplies a number that appears directly in the dip calculation. The worked example below shows the effect.

Voltage Dip: The Series Reactance Model

When the motor starts, the generator sees a large, mostly reactive load. In the first cycles the alternator behaves like a voltage source behind its subtransient reactance X"d, and the starting motor behaves like a fixed apparent power S. With both on the generator's kVA base, the voltage at the motor terminals relative to the open-circuit voltage is the motor impedance divided by the sum of the motor and source impedances. That gives the standard estimate:

X"d is on the generator's own kVA base, and it is typically in the range of roughly 0.10 to 0.25 per unit, so always take it from the data sheet. A lower-reactance alternator is a common way to cut dip when the starting motor is fixed, usually at the cost of a larger alternator frame and higher fault level.

Voltage dip against motor starting kVAVoltage dip in percent against the ratio of motor starting kVA to generator kVA, for three subtransient reactance values of 0.12, 0.18 and 0.25 per unit. Dip rises with the ratio and with reactance. At a ratio of 0.6 and 0.18 per unit the dip is about 9.7 percent.05101520250.00.20.40.60.81.01.2Motor starting kVA divided by generator kVAVoltage dip (%)X"d = 0.12X"d = 0.18X"d = 0.25worked example: 9.7%
Figure 2. Voltage dip = X"d S / (G + X"d S) plotted against S/G. A lower-reactance alternator, a larger set, or a gentler starter all move the operating point down and to the left. The dot is the DOL case in the worked example below.

The model is deliberately simple. It ignores the load already on the set, the response of the voltage regulator and exciter, cable impedance, and the fact that a motor at reduced voltage develops less torque and takes longer to start. Those effects are real, and manufacturers' motor-starting programs include them. Use this estimate for early sizing and to compare starting methods, and use the manufacturer's analysis for the final selection.

The allowable dip is a project number. It is set by the most sensitive load on the bus: contactor holding voltage, drive undervoltage trips, UPS input windows, and lighting. A limit in the range of 10 to 25% is common, but the right figure is the one the sensitive load can actually tolerate, and that comes from the equipment, not from a rule.

Frequency Recovery and Block Loading

A load step also slows the engine until the governor responds, and the frequency dip and recovery time depend on the engine, its turbocharger, and the governor, not on the alternator. This is why engines have load acceptance limits: a set can usually take only part of its rating in one step, and the rest in following steps. ISO 8528-5 defines performance classes (G1 to G3, with a G4 class by agreement) that set limits for transient frequency and voltage deviation and recovery. Turbocharged diesels and gas engines generally accept smaller single steps than naturally aspirated or lightly loaded diesels, so ask for the manufacturer's step-load curve rather than assuming a number.

For emergency and critical systems, the load is usually staged: the transfer scheme brings loads on in blocks so that no step exceeds what the engine accepts. NFPA 110 sets the performance requirements for the emergency power supply system, including how quickly it must accept load, and the NEC articles for emergency (700), legally required standby (701), optional standby (702), and critical operations power (708) systems add the installation rules. Check the edition adopted by the jurisdiction.

Non-Linear Loads: UPS and Drives

A UPS rectifier or a drive front end draws current in pulses, and a generator has a higher source impedance than the utility. The result is voltage distortion at the generator terminals, which can upset the same electronics that created it. Three practical points:

See Harmonics & Power Quality: THD, Filters, and Resonance for the background. Whether a given UPS and generator combination is acceptable is a question for both manufacturers, not a calculator.

Paralleling and Redundancy

Large facilities usually use several smaller sets in parallel instead of one large one. Paralleled sets share kW through their governors and kVAr through their voltage regulators, and the paralleling switchgear synchronizes each set before it is connected. The benefits are redundancy, a smaller step per set, and the ability to run only the sets the load needs.

Alternator fault current is a related point for protection. Without excitation support, the current collapses within a few cycles; with a permanent magnet generator or similar support, the alternator can sustain roughly three times its rated current for a few seconds, according to typical manufacturer data. Confirm the value for the actual machine before relying on it for protection coordination.

Data Center Considerations

For a data center, the generator is the last line behind the UPS, and the sizing conversation changes in three ways. First, the load is dominated by UPS input and mechanical cooling, so the non-linear and motor-start checks both matter. Second, the redundancy architecture sets the number of sets, so size from the electrical architecture first (see MV/LV Distribution Design: Feeder Sizing, Fault Levels, and Selectivity), not from a single kVA total. Third, the start-up sequence matters as much as the size: a facility that restarts cooling, UPS, and IT load in a defined order puts less stress on the set than one that reconnects everything at once.

Worked Example: 1,200 kW Plant With a 250 kW Motor

Given: running load 1,200 kW at 0.85 power factor with all loads on, 950 kW already running when the largest motor starts, 10% growth, a maximum steady loading of 80%, no site derating, a 250 kW motor at 95% efficiency and 0.88 full-load power factor, X"d of 0.18 per unit, and an allowable voltage dip of 10%. One set carries the load (N = 1).

Case A, direct on line at 6 times:

Case B, soft starter limited to 3 times:

Changing the starting method on one motor removes 1,000 kVA from the set. A drive (about 1.1 times) would cut the starting kVA further, to about 329 kVA and a dip of about 2.9%, but the steady load already governs at 2,000 kVA. That is the general pattern: starting method matters until the steady load takes over.

Case C, two paralleled sets (N = 2, DOL): each set needs 2,907 ÷ 2 = 1,453 kVA, so each is a 1,500 kVA unit. With N+1, three 1,500 kVA sets are installed. The dip with two sets online is the same 9.7%, because the combined online rating is the same 3,000 kVA, and the loss of one set still leaves two online.

These are screening numbers. The final selection needs the manufacturer's rating tables, X"d, and motor-start analysis for the exact set and starting method.

Where Standards Diverge

The sizing method is the same under NEC and IEC practice, and only the installation and performance rules differ. In North America, NFPA 110 covers emergency and standby power system performance and the NEC covers the installation and the load classes (700, 701, 702, and 708). Under IEC practice, ISO 8528 (all parts) covers the set and its performance classes, IEC 60034-1 covers the alternator rating, and IEC 60364-5-55 covers low-voltage generating sets, with IEC 60364-5-56 covering safety services. Frequency (50 or 60 Hz) changes the engine speed and the generator data, but not the kVA arithmetic here. The IEEE Orange Book (IEEE Std 446) is an older reference on emergency and standby power that is still widely cited, but check its current status before specifying it.

Practical Checklist

Summary

// RELATED ARTICLES

Motor Starting & Protection Methods: DOL, Star-Delta, Soft Starter, VFD

How each starting method changes the starting current and the protection, which feeds directly into generator sizing.

// REFERENCES